1. Use this Protected Document to open a comment box for your chosen Section, Part, Heading or clause.

2. Type your feedback into the comments box and then click "save comment" button located in the lower-right of the comment box.

3. Do not open more than one comment box at the same time.

4. When you have finished making comments proceed to the next stage by clicking on the "Continue to Step 2" button at the very bottom of this page.

 

Important Information

During the comment process you are connected to a database. Like internet banking, the session that connects you to the database may time-out due to inactivity. If you do not have JavaScript running you will recieve a message to advise you of the length of time before the time-out. If you have JavaScript enabled, the time-out is lengthy and should not cause difficulty, however you should note the following tips to avoid losing your comments or corrupting your entries:

  1. DO NOT jump between web pages/applications while logging comments.

  2. DO NOT log comments for more than one document at a time. Complete and submit all comments for one document before commenting on another.

  3. DO NOT leave your submission half way through. If you need to take a break, submit your current set of comments. The system will email you a copy of your comments so you can identify where you were up to and add to them later.

  4. DO NOT exit from the interface until you have completed all three stages of the submission process.

 

Built Environment Asset Management Policy

Section 1 - Summary

(1) This Policy sets out Victoria University’s (VU) commitments and expectations relating to the asset management of its Built Environment facilities.

Top of Page

Section 2 - TEQSA/ASQA/ESOS Alignment

(2) HESF: Standard 2.1 Facilities and Infrastructure; Standard 2.3 Wellbeing and Safety

(3) Standards for Registered Training Organisations (RTOs) 2015 (Cth): Standard 1, 8

Top of Page

Section 3 - Scope

(4) This Policy applies to Staff involved in the asset management function at VU, including consultants and contractors who provide services to VU for all onshore locations.  

Top of Page

Section 4 - Definitions

(5) Staff

(6) Asset: Any element of built infrastructure that has, or has the potential, to deliver value.

Top of Page

Section 5 - Policy Statement

(7) VU will ensure that its asset management practices are aligned to the approach of the ISO55001 Asset Management global standard and the Victorian Government’s Asset Management Accountability Framework (AMAF) by:

  1. Managing assets without compromising the safety of students, staff, contractors and the public, and in accordance with the Health and Safety Policy.
  2. Managing assets in an environmentally sustainable manner and in accordance with University strategic goals.
  3. Complying with all relevant regulatory and legislative requirements.
  4. Actively engaging with staff, students, and key stakeholders. 
  5. Facilitating continual improvement in the safety and performance of its assets, through the establishment, maintenance and governance of effective asset and safety management systems.
  6. Measuring asset performance in line with the approach in the ISO55001 Asset Management global standard framework and best practice as outlined in the AMAF. 
  7. Applying the University’s risk management framework as per the Risk Management Policy and Procedure to asset management activities.
  8. Developing and maintaining asset information systems that support asset management decisions and activities throughout the asset lifecycle.